For Australian contractors running P6

Your P6 schedule already knows. The report is the bottleneck.

Export the .xer you already produce each period. Aegis turns it into earned value, critical path and float movement, a forecast completion date with a confidence range, and a written assessment of where the numbers and the narrative disagree — the monthly report, without the week of spreadsheet work in between.

Start your 14-day trial → From $395/month inc GST · unlimited projects and users · see pricing
01
Export from P6File → Export → Primavera PM (XER). The same export you already run. MS Project XML, Excel and CSV work too.
02
Upload itThe wizard maps your columns, grades the data, and tells you what's missing before it computes anything.
03
Get the reportEarned value, critical path, float, forecast and a written assessment — most first projects are live the same day.

What P6 gives you, and what it doesn't

Primavera P6 is the best scheduling tool in the business and nothing here suggests otherwise. It builds and statuses a programme, and it holds the logic, the dates and the resource loading. What it does not do is interpret them.

The built-in report wizard and layout exports produce activity listings and time-phased cost tables. They will tell you that an activity's total float is −12 days. They will not tell you that the float on your driving path has been falling by nine days a month since March, that the trend puts practical completion three weeks past the contract date, or that the status your project manager submitted says "on track". So every month somebody exports to Excel and rebuilds the report by hand — and the report is only as current as the day that person had time to build it.

That gap is the entire reason this page exists.

What comes out

Earned valueCPI, SPI, cost and schedule variance, and estimate at completion computed from the schedule rather than typed into a spreadsheet.
Critical path & floatThe driving path, what moved it this period, and where float is being consumed before it turns negative.
Forecast completionP50 and P80 completion dates from a Monte Carlo run over the network — a range, not a single optimistic date.
Risk exposure in dollarsThe open risk position costed against remaining contingency, so the exposure is a number rather than a colour.
The Aegis AssessmentA written read of project health that opens every report, instructed never to cite a figure that isn't in the underlying data.
The gap it namesIts most important job: saying so when reported status and assessed status disagree.

Every figure traces back to the source line in your schedule or cost data. Treat the assessment as an analyst's read, not a professional sign-off — it is auditable, which is a different and more useful property.

How this compares to the usual options

ApproachInterpreted?Effort each periodHonest verdict
P6 report wizardNoLowAccurate tables nobody outside the controls team can read.
Export to Excel, build by handYes — by a personDaysWhat most contractors actually do. It works, and it stops the month the person doing it goes on leave.
BI dashboard over P6 dataNoHigh to set upBeautiful charts that still need a human to say what they mean. Real projects, real cost, long implementation.
AegisYesOne uploadReads the same export and writes the interpretation. Doesn't schedule, and doesn't try to.

What it does not do

Stated plainly, because finding out later is worse

  • It does not replace P6. Your planners keep building and statusing the programme where they do today. Aegis reads the export.
  • It does not write back to P6. The flow is one-way. Nothing Aegis produces will modify your schedule file.
  • It does not schedule. No logic editing, no resource levelling, no re-baselining. Those are P6's job and it is better at them.
  • It does not run a DCMA 14-point assessment. If that's what you need, we built a free tool that does — it scores all fourteen checks in your browser and never uploads your file.
  • It is not a professional sign-off. The assessment is an analyst's read with auditable maths behind it, not a certification.

Built for how Australian contractors actually report

Every comparable tool is built for a North American or European market and priced per seat. That matters more than it sounds. Reporting here has a principal and often a superintendent on the other side of it, progress claims and extension-of-time entitlement run off the same programme, and the people who need to see the reporting — the client, the certifier, your subcontractors — are exactly the people a per-seat licence discourages you from inviting.

So the pricing tracks combined contract value under management rather than headcount, and every plan includes unlimited users. Two $1.5M builds is $3M combined on one plan, not two subscriptions. Prices are quoted including GST, monthly, with no lock-in.

The comparison worth making is not against another piece of software. One in-house project controls hire runs $120,000–$160,000 a year plus on-costs. Aegis starts at $395 a month.

Getting started

A contract value is enough to create a project — the schedule can follow. You do not need an existing PMO, a clean baseline or a mature risk register. Aegis grades the data you have and shows exactly which gaps are limiting the analysis; closing them is the first month's work, not a prerequisite.

The 14-day trial is the full product with no limit on the contract value you load into it, so you can put the real portfolio in and see the assessment on your own jobs rather than a demo dataset.

Still deciding which scheduling tool the job should sit in? Primavera P6 vs Microsoft Project — a SWOT of both, and the contractual clause that usually settles it before features do.

Common questions

Does Aegis replace Primavera P6?

No. Your planners keep building and statusing the programme in P6. Aegis sits over the top: you export the .xer as you already do, and it produces earned value, critical path, float movement, forecast completion and a written assessment. Nothing is rebuilt elsewhere and nothing is written back.

How do I get a report out of Primavera P6?

P6's report wizard and layout exports give you activity listings and time-phased cost tables — the numbers, but not what they mean. Most teams export to Excel and rebuild a report by hand each period. Aegis takes the same .xer and produces the interpreted report directly.

What file does Aegis need?

A standard .xer export: File → Export → Primavera PM (XER). It also reads MS Project schedules saved as XML, plus Excel and CSV. The wizard maps your columns and tells you what's missing before computing anything.

Do I need a clean baseline before I start?

No. A contract value is enough to begin and the schedule can follow. Aegis grades the data you have and names the gaps limiting the analysis. Most first projects are live the same day.

How much does it cost?

From $395/month including GST, priced on combined contract value rather than per seat, with unlimited projects and users. 14-day free trial with no cap on the value you load into it. Full pricing.

Can I invite my client and subcontractors?

Yes, at no extra cost on every plan — the price tracks contract value under control, not how many people log in.

Put one real job in and see

Export the programme you already have, upload it, and read the assessment on your own project. Fourteen days, full product, no limit on contract value.

Start your 14-day trial →